The Warm Springs Creek Bridge project involved the removal of an existing concrete box culvert on Warm Springs Creek and its replacement with a new prestressed concrete bulb-tee bridge. Located in the Beaverhead-Deerlodge National Forest, the scope included clearing and grubbing, erosion control measures, traffic detour with construction and removal of a temporary bridge, structure excavation, roadway embankment, removal and disposal of the existing culvert, riprap installation, furnishing and installing precast concrete foundations and prestressed concrete bridge superstructure, guardrail installation, and roadway surfacing.
Warm Springs Creek Bridge Replacement
Warm Springs, Montana