Bible Lane Bridge Replacement

Alberton, Montana

Replacement of the existing two-lane Bible Lane bridge over Petty Creek in Alberton, MT. The project included a construction detour with a temporary bridge and removal of the existing bridge. The new bridge included newly poured abutments, tri deck girders, rip rap placement and approach paving.

Schedule Duration:
2 Months
Project Completion:
September 2020
Market Sector: Civil
Civil