Public Safety Building

Big Sky, Montana

New three-level fire station built into the hill. Concrete, structural masonry, steel Stud framing with SIP roof. Exterior finishes include is stone, wood and metal siding. This small and difficult site had a 40 foot grade difference across the building footprint.

Schedule Duration:
20 MONTHS
Project Size:
17,500 SF
Project Completion:
JUL. 2023
Market Sector:
COMMERCIAL