University of Montana – Helena College

Missoula, Montana

Metal building for welding program. This building included a specialized exhaust system to filter inside air and recycle the cleaned air back into the building for lower heating costs. Also to reduce heating expenses, a Simple Saver High-R insulation system was used; with an value of R-38 on the roof and a R-19 on the walls. To reduce lighting, skylight panels were used.

Schedule Duration:
8 Months
Project Size:
8,000 SF
Project Completion:
January 2011
Market Sector:
Higher Education